Two clocks on every container.
Demurrage runs while the box is at the terminal. Detention runs while the box has been pulled out and not given back. They start at different events, they end with different parties, and they arrive as different invoices — so counting them with one number gets one of them wrong every time. Four of the eleven steps in a forwarder’s day belong to this yard.
Four steps of the eleven, and the board they all end on.
Ordered by the cost of leaving them alone. The right column states what each one costs if it is left unattended.
Container free time
4 containers are past free time — detention is accruing
Past free time. Two days left. Gated out without a VGM. And separately, the boxes pulled before the ERD: detention is already running on a container that has not sailed, and it appears on no arrival list anywhere.
The truck did not come
Trucking orders past the collection time with no word from the carrier
Pickups whose time has passed with no contact from the driver, and the ones due inside the next twelve hours so that they can be moved before they join the first list.
The carrier’s D&D invoice
3 carrier demurrage invoices are still inside the 30-day window to dispute, the first closing in 4 days
The window to dispute closes at thirty days and the queue counts down to the first one. Separately, §541.7 gives the carrier thirty days from the last day charged to issue the invoice at all, and that one is worked out by date rather than argued about.
Arrived, and not released
Past the ETA with no arrival recorded, and arrived but not customs-released
Containers past their ETA with no arrival recorded come before tomorrow’s. Arrived and not customs-released is its own line, because it is the one that cannot be dispatched against.
The day, spread across trucks and drivers
Today’s work, assigned to trucks and drivers
The day’s work on one board, assigned to trucks and drivers, with the field app on the other end: barcode scanning, photo, signature and GPS on the proof of delivery, an offline queue for the yard with no signal, and four languages.
Two systems, three extensions, and a short list of what stays off.
A system that is off has no menus, rather than greyed-out ones, and is not billed.
SCM
WMS
Containers
Dispatch
Connect
What stays off
Free time, counted as two clocks.
The same four containers, on the two clocks that bill. One of them is running on a box that has not sailed.
| Container | Where | Demurrage | Detention | Counterparty |
|---|---|---|---|---|
| MSCU 214837-6Discharged 26 Aug | Terminal | Day 6 of 5 free PastAccruing | Not startedStill gated in | Terminal |
| TCLU 733190-2Gated out 29 Aug | Out | Stopped at gate-out4 days used | Day 4 PastYou hold the box | Carrier |
| TGHU 402118-5Pulled before ERD | Out | Not startedNever at the terminal | Day 2Has not sailed | Carrier |
| CAIU 990447-1Discharged 31 Aug | Terminal | 2 days left | Not started | Terminal |
Then the invoice arrives, and it is read too
A carrier D&D invoice is compared against the twenty items 46 CFR §541.6 requires, clause number by clause number, and the applicable items are picked by direction so an export is never failed for missing a discharge port. Where items are missing, the dispute letter is drafted and quotes §541.5: failure to include the required information “eliminates any obligation of the billed party to pay.”
§541.7 gives thirty days from the last day charged for the invoice to be issued at all, and that is computed by date. One rule the audit does not cite: §541.4 was vacated on 23 September 2025, and a letter built on it would be built on nothing.
Forty-five minutes on a real shipment.
One container is taken from discharge to gate-out to the invoice, on a demonstration company or on a copy of the yard’s own spreadsheet. A disputed D&D invoice is welcome. The session ends with a written quotation.